• About
  • Services
  • Projects
  • CONTACT
  • CONTACT

    Auckland +64 9 357 8331

    Wellington +64 4 815 8310

34 Airpark Drive Warehouse Development

Mangere, Auckland
CLIENT

Stride Group

PROJECT DESCRIPTION

34 Airpark is a 6,300 sqm greenfield warehouse and office development located within the Auckland Airport precinct. Delivered for Stride Group, the facility was completed in October 2023 and is tenanted by DHL. The building was designed to support efficient logistics operations while meeting current sustainability expectations for industrial developments.

Agile’s Green Star professional services played a key role in achieving a 5-Star Green Star design rating in July 2024. This included guiding the design team through Green Star requirements, coordinating documentation, and ensuring that all disciplines aligned with the targeted sustainability outcomes. Agile worked closely with the client and project team to integrate practical initiatives such as rainwater harvesting and EV charging, while maintaining project scope, programme, and cost control.

Engineering services delivered by Agile included mechanical, electrical, hydraulics, acoustics, alongside Green Star advisory. The approach focused on integrating sustainable design with reliable building systems, ensuring the project met both operational needs and Green Star performance criteria.

COMPLETION

2025

SERVICES

Greenstar Professional services

Sustainability modelling

Acoustics

Electrical Services

Hydraulic Services 

Mechanical Services

SECTOR

Industrial & Infrastructure

 


Back To All Projects
  • BLOG Articles
  • JOIN US Careers
  • FOLLOW US LinkedIn
  • LOCATIONS Auckland Christchurch Wellington
  • CONTACT AKL +64 9 357 8120 WGT +64 4 815 8310
  • POLICIES Privacy Policy Terms of Conditions/Use